“The attention to
detail, commercial construction expertise, and dedication to our office
project set Tower Pacific Construction apart as true experts in their
field. They did a phenomenal job.”
Dr. Ute Collins
Roosevelt Dental Center
|
|
|
|
|
Medical, Dental and Veterinary
|
|

|
 |
LabCorp/Dynacare Clinic / Mt. Vernon, WA
Design/Build construction of a new ground-up 2,700 square foot medical
clinic and office building. This clinic consists of 3 patient care
rooms and a processing area. There are also administrative and marketing offices, lab equipment, courier support, storage and break areas.
|
|
|

|
 |
Cascade Cosmetology Center
Mt Vernon, WA
Complete remodel of a 2,500 square foot office space. The clinic has 3
esthetician rooms, laser and surgical procedure rooms,
consultation and staff offices. There is a comfortable waiting area
complete with a fire place and hot beverage center, as well as a state
of the art product display area and reception desk to service
patients.
|
|
 |
|
Dr. Gardner Orthodontic Clinic
Mt Vernon, WA
New addition construction
and complete remodel of an existing 2,000 square foot orthodontic clinic
building. This clinic consists of patient consultation, exam, and treatment rooms,
office, lounge and a sterilization/lab area. It was constructed while the owner
continued to do business. The building was closed only for a 2 week period.
|
|
|

VIEW IMAGES
|
 |
Roosevelt Dental Clinic / Mount Vernon, WA
Design/Build construction of a new ground-up 4,000 square foot dental
clinic building. This clinic consists of 1 1/2 stories, 6 patient care
rooms and complete with all medical gas piping and equipment. It was
planned, designed and constructed while the owners still lived out of
state.
|
|
 |
 |
 |
|
|
 |
Cascade Cosmetic Surgery
Mount Vernon, WA
New construction of a 3,500 square foot medical facility near the
Skagit Valley Hospital. This project was awarded the 2000 Commercial
Project of the Year by the Skagit and Island County Builder's
Association. |
 |
 |
 |
Compass Health, Bldg 9, Children's Crisis Center / Everett, WA
Created a 6,000 square foot, 14 bed Children's Crisis Care facility on
the Compass Health main campus for at-risk youths. This fully
sprinklered, electronically monitored facility included kitchen and
staff areas, showers, sleeping rooms and classroom facilities. |
 |
 |
 |
|
|
 |
North Cascade Ear, Nose & Throat Clinic
Administration Office / Mount Vernon, WA
Partial demolition and extensive renovation of an existing residence
into a commercial structure. This new building currently houses the
medical administration staff for three North Cascade ENT Clinic
locations. |
 |
 |
 |
North Cascade Ear, Nose and Throat &
Facial Plastic Surgery Center / Mount Vernon, WA
Design and construction of a second Operating Room (O/R) in an existing
Outpatient Surgery Clinic. New patient recovery rooms were also added
and piped medical gases for both procedure and recovery rooms. |
 |
 |
 |
North Cascade Ear, Nose & Throat Clinic
Anacortes Facility / Anacortes, WA
Design/Build interior construction of a new 2,000 square foot ENT clinic in an existing building. |
 |
 |
 |
|
|
 |
Dr. Dennis Edmonds, DDS
Mount Vernon, WA
A major interior remodel of a fully operational dental clinic. This
facility was completely re-designed and upgraded with virtually no
interruption to their daily patient schedule during construction. |
 |
 |
 |
Burlington Physical Therapy / Burlington, WA
Design, permitting and construction of a new physical therapy clinic in
an older building that formerly operated as a retail store. This P/T
clinic was designed for 3-5 year use, with demolition and construction
of a new building to follow. |
 |
 |
 |
Dr. Raymond Bogaert, DMD / Lynnwood, WA
A 15-day shutdown and fast-track remodel of 3 operatory rooms. New
medical gas piping added. This project was performed over the Christmas
holiday and completed on Jan. 1, 2006. n Jan. 1,2006 |
 |
 |
 |
Alderwood Dental Clinic,
Dr. John Shumaker, DDS / Lynnwood, WA
3-1/2 week shutdown and complete redesign of an existing clinic.
Construction consisted of a complete upgrading of all dental operatory
areas, new sterilization, reception and waiting areas, as well as the
refurbishing of the overall space in this 23 year old clinic.
|
 |
 |
 |
|
|
 |
Lynnwood Children's Dentistry
Dr. Bunch, DDS and Dr. Marshall, DDS
Lynnwood, WA
A 10-day shutdown and fast-track
remodel of reception, office and operatory rooms. New flooring, doors,
finishes, reception desk, shelves, play area and waiting area.. |
 |
 |
 |
|
Care Veterinary Center
Dr. Jayne McKelvy, DVM / Mount Vernon, WA
Tenant Improvement of a new 3,500 square foot Veterinary clinic in an existing lease space. Owner participation on project.n project.
|
 |
 |
 |
|
Dr. Leann Winter, DDS / Everett, WA
Full remodel of a dental clinic. Construction consisted of upgrading
all dental operatory areas, new sterilization, reception and waiting
areas. This project was completed within a 3 week period with the
clinic staff undergoing a temporary shutdown/vacation
|
 |
 |
 |
Community Mental Health Services / Mount Vernon, WA
Interior tenant improvement of doctor and staff offices for mental
health counseling and treatment in the Mount Vernon facility.. c |
 |
 |
 |
Option Care / Mount Vernon, WA
Remodel of an existing office building for a medical care supplier and
construction of a small garage/warehouse facility attached to the
existing structure. |
 |
 |
 |
Phoenix Recovery Services / Mount Vernon, WA
Renovation of an existing 4,600 square foot building to provide
community services for a drug, alcohol, and chemical dependency
outpatient center. |
| |
| [RETURN TO TOP] |
| |
|
|
|