home contact projects about us services plan center
 
“The attention to
detail, commercial construction expertise, and dedication to our office project set Tower Pacific Construction apart as true experts in their field. They did a phenomenal job.”


Dr. Ute
Collins
Roosevelt Dental Center
Medical, Dental and Veterinary


LabCorp/Dynacare Clinic / Mt. Vernon, WA
Design/Build construction of a new ground-up 2,700 square foot medical clinic and office building. This clinic consists of 3 patient care rooms and a processing area.  There are also administrative and marketing offices
, lab equipment, courier support, storage and break areas. 


Cascade Cosmetology Center
Mt Vernon, WA
Complete remodel of a 2,500 square foot office space. The clinic has 3 esthetician rooms, laser and surgical procedure rooms, consultation and staff offices. There is a comfortable waiting area complete with a fire place and hot beverage center, as well as a state of the art  product display area and reception desk to service patients.

gardner
Dr. Gardner Orthodontic Clinic
Mt Vernon, WA
New addition construction and complete remodel of an existing 2,000 square foot orthodontic clinic building. This clinic consists of patient consultation, exam, and treatment rooms, office, lounge and a sterilization/lab area. It was constructed while the owner continued to do business. The building was closed only for a 2 week period.


VIEW IMAGES

Roosevelt Dental Clinic / Mount Vernon, WA
Design/Build construction of a new ground-up 4,000 square foot dental clinic building. This clinic consists of 1 1/2 stories, 6 patient care rooms and complete with all medical gas piping and equipment. It was planned, designed and constructed while the owners still lived out of state.
Cascade Cosmetic Surgery
Mount Vernon, WA

New construction of a 3,500 square foot medical facility near the Skagit Valley Hospital. This project was awarded the 2000 Commercial Project of the Year by the Skagit and Island County Builder's Association.
Compass Health, Bldg 9, Children's Crisis Center / Everett, WA
Created a 6,000 square foot, 14 bed Children's Crisis Care facility on the Compass Health main campus for at-risk youths. This fully sprinklered, electronically monitored facility included kitchen and staff areas, showers, sleeping rooms and classroom facilities.
North Cascade Ear, Nose & Throat Clinic
Administration Office
/ Mount Vernon, WA
Partial demolition and extensive renovation of an existing residence into a commercial structure. This new building currently houses the medical administration staff for three North Cascade ENT Clinic locations.
North Cascade Ear, Nose and Throat &
Facial Plastic Surgery Center / Mount Vernon, WA

Design and construction of a second Operating Room (O/R) in an existing Outpatient Surgery Clinic. New patient recovery rooms were also added and piped medical gases for both procedure and recovery rooms.
North Cascade Ear, Nose & Throat Clinic
Anacortes Facility
/ Anacortes, WA
Design/Build interior construction of a new 2,000 square foot ENT clinic in an existing building.
Dr. Dennis Edmonds, DDS 
Mount Vernon, WA
A major interior remodel of a fully operational dental clinic. This facility was completely re-designed and upgraded with virtually no interruption to their daily patient schedule during construction.
Burlington Physical Therapy / Burlington, WA
Design, permitting and construction of a new physical therapy clinic in an older building that formerly operated as a retail store. This P/T clinic was designed for 3-5 year use, with demolition and construction of a new building to follow.
Dr. Raymond Bogaert, DMD / Lynnwood, WA
A 15-day shutdown and fast-track remodel of 3 operatory rooms. New medical gas piping added. This project was performed over the Christmas holiday and completed on Jan. 1, 2006.
n Jan. 1,2006
Alderwood Dental Clinic,
Dr. John Shumaker, DDS
/ Lynnwood, WA
3-1/2 week shutdown and complete redesign of an existing clinic. Construction consisted of a complete upgrading of all dental operatory areas, new sterilization, reception and waiting areas, as well as the refurbishing of the overall space in this 23 year old clinic.
Lynnwood Children's Dentistry
Dr. Bunch, DDS and Dr. Marshall, DDS

Lynnwood, WA
A 10-day shutdown and fast-track remodel of reception, office and operatory rooms. New flooring, doors, finishes, reception desk, shelves, play area and waiting area.
.

Care Veterinary Center
Dr. Jayne McKelvy, DVM / Mount Vernon, WA

Tenant Improvement of a new 3,500 square foot Veterinary clinic in an existing lease space. Owner participation on project.
n project.

Dr. Leann Winter, DDS / Everett, WA
Full remodel of a dental clinic. Construction consisted of upgrading all dental operatory areas, new sterilization, reception and waiting areas. This project was completed within a 3 week period with the clinic staff undergoing a temporary shutdown/vacation

Community Mental Health Services / Mount Vernon, WA
Interior tenant improvement of doctor and staff offices for mental health counseling and treatment in the Mount Vernon facility..
c
Option Care / Mount Vernon, WA
Remodel of an existing office building for a medical care supplier and construction of a small garage/warehouse facility attached to the existing structure.
Phoenix Recovery Services / Mount Vernon, WA
Renovation of an existing 4,600 square foot building to provide community services for a drug, alcohol, and chemical dependency outpatient center.
 